Data centers in Akureyrarbær: 1 project mapped

1 project tracked
·
1 operating
·
12 MW reported
atNorth ICE03 (Akureyri) (Operating, 12 MW)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power1 site shown

Akureyri has one data center, atNorth's ICE03, on a one-hectare plot granted by the town planning council with nearby land for expansion. It opened with 12 megawatts of power in two buildings and could grow to five buildings and 50 megawatts. The state power company Landsvirkjun has signed a new five-year contract to supply it with up to 12 megawatts from the second half of 2026, and in September 2026 atNorth was sold to the Canadian pension fund CPP Investments and Equinix in a $4 billion deal.

The site exists because of a quirk of the grid: limits on Iceland's transmission lines leave the north with more electricity than it can send south, Landsvirkjun says. "The location of the data center in Akureyri is very practical as energy demand in the South is already high," Landsvirkjun's Tinna Traustadóttir said. Mayor Ásthildur Sturludóttir welcomed the jobs and tied the project to new power lines in the northeast.

In November 2024 atNorth began expanding ICE03 alongside its site in Reykjanesbær, a joint investment of 41.2 billion krónur. The start-up Hringvarmi is using the data center's waste heat to grow microgreens with Rækta Microfarm. Data centers used just under 4 percent of Iceland's electricity in the first half of 2026, Landsvirkjun told Iceland Review.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

Akureyrarbær1
ProjectCompanyStatusPower
atNorth ICE03 (Akureyri) atNorth (CPP Investments / Equinix) Operating 12 MW

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.