Global Data Centers.formerly Florida Data Centers

Home/India/Tamil Nadu

Data centers by place

Data centers in Tamil Nadu: 3 projects mapped

3 projects tracked
·
1 proposed or being built
·
2 operating
·
233 MW from the 2 active projects that report a figure
Yotta Chennai Data Center Park (CH1) (Proposed, 200 MW)AdaniConneX Chennai 1 (SIPCOT IT Park) (Operating, 33 MW)NTT Chennai (DC1 / Chennai 2) (Operating)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power3 sites shown

Tamil Nadu's data centers are going up in Chennai, mostly at Siruseri on the IT corridor and at Ambattur. In 2026 ST Telemedia Global Data Centres opened the first 7.2 megawatts of a planned 45-megawatt campus at Siruseri, adding to 40 megawatts it already runs at Ambattur, and Techno Digital opened a 36-megawatt data center at SIPCOT IT Park in Siruseri in February. AdaniConneX's Chennai 1, at the same park, opened in November 2022 with 17 megawatts and is planned to reach 33.

The worry is water, in a city that nearly ran dry in 2019 and had to bring supplies in by train. Not all data centers publish precise water-use figures, researcher Anusreeta Dutta wrote in Down To Earth in July 2026, arguing that permits should require disclosure of power and water use and weigh clusters of data centers together. Operators say Indian data centers mostly use air-cooled chillers. "The concerns are overstated," Yotta chief executive Sunil Gupta told Business Standard.

The state's 2021 data center policy offered cheaper power, stamp duty breaks and land subsidies to projects of more than Rs 500 crore that got at least 30% of their energy from renewables. It expired in April 2026, and the law firm Ahlawat & Associates noted that no extension had been announced. Dutta wrote that worries over resource use and few jobs had led the state to revisit parts of its incentives in favor of location-specific ones tied to renewable energy. STT has signed an agreement with the state proposing Rs 4,200 crore more.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

Tamil Nadu3
ProjectCompanyStatusPower
Yotta Chennai Data Center Park (CH1)Exact site not confirmed Yotta (Hiranandani) Proposed 200 MW
AdaniConneX Chennai 1 (SIPCOT IT Park) AdaniConneX (Adani + EdgeConneX) Operating 33 MW
NTT Chennai (DC1 / Chennai 2) NTT Global Data Centers Operating Not reported

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.