Data centers in New London County, Connecticut: 2 projects mapped

2 projects tracked
·
2 stopped or paused
·
1 moratorium or ban in effect
GotSpace Data Center (Blocked)NE Edge Millstone (Waterford) (Cancelled, 300 MW)
Imagery: Esri, Maxar
Stopped or pausedBigger dot, more power2 sites shown

New London County has been the stage for most of Connecticut's hyperscale data center plans since the state passed a 2021 tax break waiving property and sales taxes for 20 years on data centers investing $200 million or more, and none of them has been built. The appeal was the Millstone nuclear power station in Waterford, the only nuclear plant in the state. The developers were two rival start-ups: GotSpace Data Partners, which proposed campuses in Groton, Bozrah, Norwich and Griswold, and NE Edge, founded in December 2021 by GotSpace's former co-owner Thomas Quinn. Bozrah rejected GotSpace's plans, partly over doubts about the company's stability, and what remains of GotSpace has filed a $30 billion lawsuit against NE Edge, the town of Groton and dozens of others that has barely moved.

Groton turned both away. In March 2022 its town council voted 5-1 against a host agreement for NE Edge's two 250,000-square-foot buildings near Interstate 95; Councilor Aundré Bumgardner said he "heard a resounding no from the public" and added "with prejudice" to the motion. After a year-long moratorium, the Planning and Zoning Commission unanimously banned data centers larger than 12,500 square feet, about the size of Pfizer's on-site facility. The landowner who had agreed to sell NE Edge 168 acres on Hazelnut Hill and Flanders roads for $5.25 million sued the town for more than $2 million.

In Waterford, NE Edge and Dominion Energy signed a host fee agreement in March 2023 for a 300-megawatt, 1.5-million-square-foot campus on the Millstone site drawing power directly from the plant, paying $231 million over 30 years in place of property taxes. Residents raised concerns about noise, traffic, fire risk and flooding at the site, and the Connecticut Siting Council refused Dominion's request to hand approval to the town. The proposal has since been dropped. The only company to use the tax break so far is Cigna, which reported $863 million of investment for five new jobs.

Data center projects on record in New London County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Bozrah1
ProjectCompanyStatusPower
GotSpace Data CenterBozrah GotSpace Data Partners Blocked Not reported
Waterford1
ProjectCompanyStatusPower
NE Edge Millstone (Waterford)Waterford NE Edge Cancelled 300 MW

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Moratoriums and bans in effect

Pauses on new data centers covering this area.

PlaceTypeStartedEnds
GrotonTown or city Ban Jun 29, 2023 No end date Record off site ↗