Data centers by company

Switch data centers: 13 sites mapped

13 projects tracked
·
4 proposed or being built
·
6 operating
·
3 with no stage on record
·
150 MW from the one active project that reports a figure
·
1 country
Switch Keep Campus (Douglasville) (Operating, 150 MW)Switch Core Campus (Las Vegas) (Operating)Switch Armory Campus (Enterprise) (Proposed)Switch Citadel Campus (Tahoe Reno) (Operating)Switch Pyramid Campus (Grand Rapids) (Operating)Switch The Rock (Round Rock) (Approved)Switch Round Rock East (Louis Henna Blvd) (Not reported)Switch Smith School Rd (Austin) (Operating)Lambda Austin (Met Center) (Not reported)Switch Houston 2/3 (Greenspoint) (Operating)Switch Big Beaver (Pittsburgh) (Proposed)Switch Iron County (Utah) (Not reported)Switch Data Center (Under construction)
Boundaries: Natural Earth
Tracked projectBigger dot, more power13 sites shown

Switch, a colocation company founded in 2000 and owned by DigitalBridge and IFM Investors since a $11 billion buyout in December 2022, runs its largest campuses in Las Vegas and Reno, Nevada, plus Grand Rapids, Michigan, Austin, Texas, and Atlanta, Georgia. On June 17, 2026 the Clark County Commission approved LAS 19, a 56,800 square foot building near Warm Springs Road in Las Vegas, over objections from residents and the Sierra Club.

The local advisory board had recommended denying some of the design waivers Switch sought. "Data centers are destroying communities, driving climate change, consuming resources and enriching tech billionaires," said Marija Minic of the Sierra Club's Toiyabe chapter. Switch dropped a request to skip the county's tree-planting rule and agreed to help pay for a barrier along the road. Commissioner Tick Segerblom voted yes but said the county needs a data center ordinance: "This valley is so small."

Nevada's utility, NV Energy, puts the power demand of 12 proposed data center projects statewide at 5,900 megawatts, about 2.8 times the capacity of Hoover Dam. Reno's city council has voted to extend a data center moratorium through August 31, 2027, and Henderson's council is weighing a pause of up to 180 days on permits. Switch is expanding east too, announcing a 382-acre campus in Big Beaver Borough, Beaver County, Pennsylvania, about 40 miles northwest of Pittsburgh, that it says will use closed-loop cooling that consumes no water.

Switch sites on record

Grouped by country, then by state or region, biggest first. Open one to see the projects there. The report above may name sites that have no record here yet.

United States13 · 150 MW
Georgia2
ProjectCompanyStatusPower
Switch Keep Campus (Douglasville)Lithia Springs Switch Operating 150 MW
Switch Data CenterCartersville Switch Under construction Not reported
Texas5
ProjectCompanyStatusPower
Lambda Austin (Met Center)Austin Switch Not reported Not reported
Switch Houston 2/3 (Greenspoint)Houston Switch Operating Not reported
Switch Round Rock East (Louis Henna Blvd)Round Rock Switch Not reported Not reported
Switch Smith School Rd (Austin)Austin Switch Operating Not reported
Switch The Rock (Round Rock)Round Rock Switch Approved Not reported
Nevada3
ProjectCompanyStatusPower
Switch Armory Campus (Enterprise)Las Vegas Switch Proposed Not reported
Switch Citadel Campus (Tahoe Reno)McCarran Switch Operating Not reported
Switch Core Campus (Las Vegas)Las Vegas Switch Operating Not reported
Michigan1
ProjectCompanyStatusPower
Switch Pyramid Campus (Grand Rapids)Grand Rapids Switch Operating Not reported
Pennsylvania1
ProjectCompanyStatusPower
Switch Big Beaver (Pittsburgh)Big Beaver Switch Proposed Not reported
Utah1
ProjectCompanyStatusPower
Switch Iron County (Utah)Cedar City Switch Not reported Not reported

Every data center in United States