Data centers in Switzerland: 6 projects mapped

6 projects tracked
·
4 operating
·
2 with no stage on record
·
110 MW from the 3 active projects that report a figure
Digital Realty Zurich (Glattbrugg) (Operating, expanding, 60 MW)STACK Zurich (ZUR01) (Not reported, 10 MW)Vantage Zurich I (Winterthur) (Operating, 40 MW)Digital Realty Geneva (Eysins) (Not reported)Equinix Zurich Industrial Campus (ZH4/ZH5) (Operating)Equinix Geneva Interconnection Center (GV1/GV2) (Operating)
Boundaries: Natural Earth
Tracked projectBigger dot, more power6 sites shown

Switzerland's data center fight is in Beringen, a village of about 5,000 people in canton Schaffhausen. Stack Infrastructure is building a data center on the Beringerfeld that will use 315 gigawatt-hours of electricity a year, and a few hundred meters away Enka Investment AG, the Swiss arm of the Turkish builder Enka, has filed plans for a second that would average 20 megawatts of power and peak at 40. Both are due on the grid in 2028; Enka's building application is still under review by the municipality.

Stack's plant alone will use up to three-quarters of what the whole canton used in 2022, and the cantonal utility is building a new substation for it, paid for by the operator. The village approved 55,000 cubic meters of water a year for its cooling, and Enka's would take another 30,000; the village president, Roger Paillard, expects the two together to add 10 to 15% to Beringen's water use.

Read more

In the summer, activists from the group Aufstände der Allmende camped near the site. Three cantonal lawmakers, Maurus Pfalzgraf, Nina Schärrer and Markus Leu, have put a motion to the cantonal parliament's building committee that would make new data centers reuse their waste heat, and want it in force before Enka's plant is approved.

Around Zurich, where most Swiss data centers are, Green is completing a three-building, 35-megawatt campus in Dielsdorf, which will use seven times as much electricity as the rest of the municipality. In Winterthur, Vantage is building four data centers with 40 megawatts, which will raise the city's electricity use by about half. Zurich's canton already requires operators to make their waste heat available.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Zurich4
ProjectCompanyStatusPower
Digital Realty Zurich (Glattbrugg) Digital Realty Operating, expanding 60 MW Source off site ↗
Vantage Zurich I (Winterthur) Vantage Data Centers Operating 40 MW
STACK Zurich (ZUR01) STACK Infrastructure Not reported 10 MW Source off site ↗
Equinix Zurich Industrial Campus (ZH4/ZH5) Equinix Operating Not reported Source off site ↗

Open the Zurich page

Geneva1
ProjectCompanyStatusPower
Equinix Geneva Interconnection Center (GV1/GV2) Equinix Operating Not reported Source off site ↗

Open the Geneva page

Vaud1
ProjectCompanyStatusPower
Digital Realty Geneva (Eysins) Digital Realty Not reported Not reported Source off site ↗

Open the Vaud page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.