Data centers in Racine County, Wisconsin: 3 projects mapped

3 projects tracked
·
1 proposed or being built
·
1 operating
·
1 stopped or paused
·
369 MW from the one active project that reports a figure
Microsoft Fairwater Wisconsin (Operating, 369 MW)Microsoft Project Nova (Caledonia) (Withdrawn)Microsoft Kenosha (Louis Sorenson Rd) (Proposed)
Imagery: Esri, Maxar
Tracked projectStopped or pausedBigger dot, more power3 sites shown

Microsoft is building on land Mount Pleasant prepared for a Foxconn campus that never arrived at full scale. Its first building, Fairwater, came online in April 2026 with about 550 workers; a second is planned for 2028. With a $4 billion expansion announced in 2025, Microsoft's investment in the two campuses reached $7.7 billion, and in January the village board approved site plans for 15 more data center buildings on two new campuses worth more than $13 billion. Microsoft guaranteed the village a minimum assessed value of $1.4 billion by 2028.

Not everyone gained. When Fairwater came online, Sturtevant residents just north of the campus reported a fan hum they could hear indoors with windows shut; Microsoft adjusted the fans and says the problem is fixed. In Caledonia, more than 40 residents spoke against a Microsoft-linked proposal for three buildings and a substation on former We Energies farmland; the plan commission approved rezoning 5-2 in September 2025, but Microsoft withdrew the request in October after the pushback.

Read more

Electricity is the larger fight. WEC Energy Group expects 2.6 gigawatts of new demand from Microsoft's buildout here and 1.3 gigawatts from Vantage's Port Washington campus. On April 24 the Public Service Commission approved a special rate for very large customers but tightened it first: data centers must now cover 100 percent of the cost of new gas plants built for them, not 75 percent.

"Existing Wisconsin customers should not pay a single cent to subsidize the service of data centers," said Commissioner Kristy Nieto. Microsoft signed its 15-year contract under the new rate on July 16; the 2027 rate case will be the first test of whether it holds.

Data center projects on record in Racine County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Caledonia1
ProjectCompanyStatusPower
Microsoft Project Nova (Caledonia)Caledonia Microsoft Withdrawn Not reported
Kenosha1
ProjectCompanyStatusPower
Microsoft Kenosha (Louis Sorenson Rd)Kenosha Microsoft Proposed Not reported
Mount Pleasant1
ProjectCompanyStatusPower
Microsoft Fairwater WisconsinMount Pleasant Microsoft Operating 369 MW

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.