The siteImagery: Esri, Maxar
This data center in VIC, Victoria is run by STACK Infrastructure. Sources put it at 180 MW.
180 MWreported power
Operatingstatus
The facts on file
- Company
- STACK Infrastructure
- Address
- 399 Palmers Rd, Truganina, VIC, Australia
- Region
- Victoria
- Country
- Australia
- Status
- Operating
- Power
- 180 MW
- On that figure
- planned campus total per STACK; DCD says the operating part is two 36 MW buildings (72 MW)
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
- AirTrunk MEL1 (Melbourne West)3 km
- CDC Laverton North3 km
- Digital Realty Melbourne (MEL10/MEL11 72 Radnor)5 km
- Southgate Melbourne9 km
- CDC Brooklyn9 km
- NEXTDC M3 Melbourne10 km
- NEXTDC M4 Melbournelisted on the Victoria page14 km
- Equinix Melbourne Deer Park Campus (ME1/ME2)listed on the VIC page15 km
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.