Data centers in São Paulo: 11 projects mapped

11 projects tracked
·
3 proposed or being built
·
8 operating
·
1,033 MW from the 8 active projects that report a figure
Scala Tambore Campus (Barueri, 17 buildings planned) (Under construction, 600 MW)CloudHQ Campinas (GRU Technology Campus) (Proposed, 288 MW)Ascenty Vinhedo (1/2) (Operating, 61 MW)Aligned SP-01 (Santana de Parnaiba) (Operating, 19.4 MW)Aligned SP-02 (Hortolandia) (Operating, 40 MW)Ascenty Paulinia (Operating, 14 MW)Scala Sao Paulo City (SGRUSP) (Operating, 4 MW)Scala Campinas (Operating, 7 MW)Google Osasco (Operating)Microsoft Hortolandia (Under construction)Aligned SP-03 (Barueri) (Operating)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power11 sites shown

São Paulo state holds almost a third of Brazil's 195 data centers, most of them in the western suburbs of the capital. The biggest project is Scala Data Centers' 600-megawatt Tamboré campus in Barueri, under construction. In Santana de Parnaíba, next door, ODATA runs a 19.4-megawatt site and Tec.to is building one planned to reach 182 megawatts of power by 2030, near a protected spring on the Tietê River. Farther out, Ascenty runs two data centers totaling 61 megawatts in Vinhedo.

Water is the local worry. In 2025 Greater São Paulo's main reservoirs fell to their lowest level since 2015, and Sabesp cut water pressure in Barueri. When Vinhedo rationed water in 2024, the city's map showed Ascenty's industrial district was spared, Agência Pública reported. "In a shortage, the priority under our water law is to quench the thirst of animals and supply people, not to generate profit for any other sector," said Ângelo Lima of the Observatório das Águas. Tec.to says its closed-circuit cooling keeps water use low.

The power grid is the other limit. In September 2025 the national grid operator ONS said most data center connection requests were in São Paulo state, and a 2025 transmission auction lot was designed to add capacity for Barueri, Santana de Parnaíba and part of the capital. Federal policy favors more building: President Lula signed the Redata tax break into law in September 2026 for operators that meet a water-use limit and buy clean power, while environmental licensing is still left to each city.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

São Paulo11
ProjectCompanyStatusPower
Scala Tambore Campus (Barueri, 17 buildings planned)Barueri Scala Data Centers (DigitalBridge) Under construction 600 MW
CloudHQ Campinas (GRU Technology Campus) CloudHQ Proposed 288 MW
Ascenty Vinhedo (1/2) Ascenty (Digital Realty) Operating 61 MW
Aligned SP-02 (Hortolandia)Hortolandia Aligned Data Centers (ODATA) Operating 40 MW
Aligned SP-01 (Santana de Parnaiba)Santana de Parnaiba Aligned Data Centers (ODATA) Operating 19.4 MW
Ascenty Paulinia Ascenty (Digital Realty) Operating 14 MW
Scala CampinasCampinas Scala Data Centers (DigitalBridge) Operating 7 MW Source off site ↗
Scala Sao Paulo City (SGRUSP)Sao Paulo Scala Data Centers (DigitalBridge) Operating 4 MW Source off site ↗
Aligned SP-03 (Barueri)Barueri Aligned Data Centers (ODATA) Operating Not reported
Google OsascoSao Paulo Google Operating Not reported
Microsoft HortolandiaHortolandia Microsoft Under construction Not reported