Data centers in Saudi Arabia: 7 projects mapped

7 projects tracked
·
5 proposed or being built
·
1 operating
·
1 with no stage on record
·
1,260 MW from the 5 active projects that report a figure
xAI Saudi Arabia (HUMAIN 500MW) (Proposed, 500 MW)HUMAIN Riyadh (Under construction, 100 MW)HUMAIN Dammam (Under construction, 100 MW)Khazna Saudi Arabia (2 sites) (Proposed, 200 MW)HUMAIN / DataVolt Oxagon Campus (NEOM) (Under construction, 360 MW)Tencent Cloud Riyadh (Operating)HUMAIN / stc center3 JV (up to 1GW) (Not reported)
Boundaries: Natural Earth
Tracked projectBigger dot, more power7 sites shown

Saudi Arabia's data center building is led by the state. Humain, the AI company Crown Prince Mohammed bin Salman launched in May 2025 under the Public Investment Fund, broke ground on its first two data centers in Riyadh and Dammam, each starting at 100 megawatts of power. Both were due to go live in the second quarter of 2026; no opening has been announced. On the Red Sea coast, Humain and DataVolt have started building 100 megawatts of a 360-megawatt first phase at Neom's Oxagon industrial district, due in 2028.

The biggest plan is in east Riyadh, where Humain has tendered the power network for a 6-gigawatt campus on a 24-square-kilometer site in the Al-Saad area, to be built in six 1-gigawatt plots. Humain says it has secured 211 plots of land across the kingdom but will not say where. Its partners include Amazon Web Services, Saudi Telecom and Elon Musk's xAI, which plans a 500-megawatt data center with it.

Heat is the local problem. A Rest of World and Climate Central analysis found nearly all of the kingdom's data centers sit in regions too hot for efficient operation. The consultancy Alvarez & Marsal puts installed capacity at about 410 megawatts today, rising to about 1 gigawatt by 2030 in its base case, far below what has been announced.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Riyadh Province5
ProjectCompanyStatusPower
xAI Saudi Arabia (HUMAIN 500MW)RiyadhExact site not confirmed HUMAIN Proposed 500 MW
Khazna Saudi Arabia (2 sites)DammamExact site not confirmed Khazna Data Centers (G42) Proposed 200 MW
HUMAIN RiyadhRiyadh HUMAIN (PIF) Under construction 100 MW
HUMAIN / stc center3 JV (up to 1GW)Exact site not confirmed HUMAIN / stc center3 Not reported Not reported
Tencent Cloud RiyadhRiyadhExact site not confirmed Tencent Cloud Operating Not reported

Open the Riyadh Province page

Eastern Province1
ProjectCompanyStatusPower
HUMAIN DammamDammamExact site not confirmed HUMAIN (PIF) Under construction 100 MW

Open the Eastern Province page

Tabuk Province1
ProjectCompanyStatusPower
HUMAIN / DataVolt Oxagon Campus (NEOM)NEOMExact site not confirmed DataVolt Under construction 360 MW

Open the Tabuk Province page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.