Data centers in Ozaukee County, Wisconsin: 2 projects mapped

2 projects tracked
·
1 proposed or being built
·
1 with no stage on record
·
1,300 MW from the one active project that reports a figure
Vantage Lighthouse (Under construction, 1,300 MW)STACK Port Washington (Not reported)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power2 sites shown

Port Washington held the first anti-data-center referendum in the United States and passed it with about 66 percent of the vote on April 7, 2026. The measure does not ban anything; it requires voter approval before the city creates any tax incremental financing district worth more than $10 million, the usual way these projects get financed. It followed anger that the city had approved a district for Vantage's Lighthouse campus, a $15 billion project on 647 acres now under construction, without a public vote.

A grassroots group called Great Lakes Neighbors United gathered a thousand signatures to put the measure on the ballot. It had no effect on Lighthouse, which was already approved and being built; it changes every deal after it, since an incentive now has to survive an election rather than a council vote. The Badger Institute has argued that putting incentives to referendum could stall development statewide, but the group that led the campaign calls the result a win for public participation rather than a defeat for the data center.

Data center projects on record in Ozaukee County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Port Washington2
ProjectCompanyStatusPower
Vantage LighthousePort WashingtonExact site not confirmed Vantage Data Centers Under construction 1,300 MW
STACK Port WashingtonPort Washington STACK Infrastructure Not reported Not reported Source off site ↗

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Zoning limits on data centers

Rules short of a pause: setbacks, noise caps, permit requirements and district limits.

PlaceTypeStartedEnds
Port WashingtonTown or city Other Apr 8, 2026 No end date Record off site ↗