Home/United States/Virginia/Prince William County/CloudHQ Manassas MCC Campus
CloudHQ project
CloudHQ Manassas MCC Campus data center, Manassas, Virginia
10900 Airman Ave, Manassas, VA 20110
CloudHQ·Operating·382 MW
The siteImagery: Esri, Maxar
This data center in Manassas, Prince William County is run by CloudHQ. Sources put it at 382 MW.
382 MWreported power
Operatingstatus
The facts on file
- Company
- CloudHQ
- Address
- 10900 Airman Ave, Manassas, VA 20110
- County
- Prince William County, Virginia
- Country
- United States
- Status
- Operating
- Power
- 382 MW
- On that figure
- campus total critical IT load across seven buildings; 96 MW still available
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
- CloudHQ Manassas MDC Campus1 km
- AWS Manassas Tanner Way3 km
- AWS Manassas Nokesville Road4 km
- AWS Manassas Innovation Drive4 km
- CloudHQ Manassas (MCC1/MCC2)5 km
- QTS Manassas 15 km
- STACK Infrastructure NVA025 km
- STACK Manassas (NVA05 Freedom Center)listed on the Prince William County page5 km
Moratoriums covering this site
| Place | Type | Started | Ends | |
|---|---|---|---|---|
| Prince William County (countywide end of by-right zoning)County | Zoning limits | Sep 22, 2026 | No end date | Record off site ↗ |
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.