Global Data Centers.formerly Florida Data Centers

Home/South Africa/Gauteng

Data centers by place

Data centers in Gauteng: 6 projects mapped

6 projects tracked
·
1 proposed or being built
·
5 operating
·
243 MW from the 4 active projects that report a figure
Vantage JNB1 Waterfall City (Operating, expanding, 120 MW)Teraco Bredell Campus (Operating, 63 MW)Vantage JNB2 Isando (Under construction, 20 MW)Africa Data Centres Samrand (Operating, expanding, 40 MW)Teraco Johannesburg Sandton (Isando / Chislehurston) (Operating)Huawei Cloud Johannesburg (Operating)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power6 sites shown

Gauteng, around Johannesburg, holds many of South Africa's largest data centers; South Africa has about 70 percent of Africa's. Teraco's Isando campus has 70 megawatts of computing power and its Bredell campus in Ekurhuleni has 63 megawatts, Teraco says. NTT Data's Midrand facility has 12 megawatts. Vantage is building three data centers in Waterfall City planned at 120 megawatts, and Africa Data Centres runs facilities in Midrand and Samrand.

In September 2026 civil rights groups called for a halt to new data centers until their use of water, land and electricity had been investigated. The South African Human Rights Commission, which sought public input in May, said it had received more than 250 submissions. "A key issue emerging from the process is precisely the availability, consistency and transparency of information relating to matters such as electricity and water demand, land use, infrastructure requirements, environmental impacts and impacts on surrounding communities," said Dr. Eileen Carter, who leads the commission's review. Street protests have centred on Cape Town, where the Housing Assembly is fighting two data centers proposed by Equinix.

Eskom says it can meet current demand from data centers, though the country had near-daily power cuts in 2023. On water, Teraco's head of sustainability Bryce Allan said a 30-megawatt data center using closed-loop cooling "would consume the same amount of water as the average restaurant" in a year. "When we look at our domestic power requirements, it necessitates a conversation about prioritising," said Daniel Hartford of Foxglove.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

Gauteng6
ProjectCompanyStatusPower
Vantage JNB1 Waterfall CityJohannesburg Vantage Data Centers/Attacq Operating, expanding 120 MW
Teraco Bredell CampusKempton Park Teraco (Digital Realty) Operating 63 MW
Africa Data Centres Samrand Africa Data Centres (Cassava) Operating, expanding 40 MW
Vantage JNB2 Isando Vantage Data Centers Under construction 20 MW
Huawei Cloud JohannesburgKempton Park Huawei Cloud Operating Not reported
Teraco Johannesburg Sandton (Isando / Chislehurston)Sandton Teraco (Digital Realty) Operating Not reported

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.