Global Data Centers.formerly Florida Data Centers

Home/Data centers/South Africa

Data centers by place

Data centers in South Africa: 9 projects mapped

9 projects tracked
·
1 proposed or being built
·
8 operating
·
245 MW from the 5 active projects that report a figure
Vantage JNB1 Waterfall City (Operating, expanding, 120 MW)Teraco Bredell Campus (Operating, 63 MW)Vantage JNB2 Isando (Under construction, 20 MW)Africa Data Centres Samrand (Operating, expanding, 40 MW)Teraco Durban DB1 (Operating, 2.2 MW)Teraco Cape Town (CT1/CT2 Brackenfell) (Operating)Teraco Johannesburg Sandton (Isando / Chislehurston) (Operating)AWS Cape Town Region (Operating)Huawei Cloud Johannesburg (Operating)
Boundaries: Natural Earth
Tracked projectBigger dot, more power9 sites shown

South Africa's data centers are concentrated around Johannesburg, where Teraco's Isando campus has 70 megawatts of power for computers and its Bredell campus 63, and Cape Town is next. On July 14, 2026, Cape Town's Municipal Planning Tribunal approved Equinix's plan for two data centers on the old King David golf course next to Cape Town International Airport, with a peak demand of up to 160 megawatts. The objectors' lawyers at the Legal Resources Centre said they were considering an appeal.

The Housing Assembly and the London group Foxglove objected that the rezoning rested on a 24-page letter "that says nothing about water, nothing about emissions," in a city that nearly ran out of water in 2018. Equinix says the buildings will use dry, air-based cooling. Four large projects planned in Cape Town, including a 360-megawatt campus announced by the Cavaleros Group, would together need 580 megawatts, just over a third of the city's current peak demand.

Read more

In September 2026 civil rights groups called for a halt to new data centers until their use of water, land and electricity has been investigated. The South African Human Rights Commission has received more than 250 submissions in its own inquiry. Eskom, the state power company, came through the winter with a surplus, and campaigners fear that power will be sold to data centers.

In Durban, eThekwini's council agreed in February 2026 to explore an AI data center in the south of the city with a Korean consortium; the city says only the exploratory agreement was approved, not a project. Teraco's existing Durban data center, DB1, has 2.2 megawatts.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Gauteng6
ProjectCompanyStatusPower
Vantage JNB1 Waterfall CityJohannesburg Vantage Data Centers/Attacq Operating, expanding 120 MW
Teraco Bredell CampusKempton Park Teraco (Digital Realty) Operating 63 MW
Africa Data Centres Samrand Africa Data Centres (Cassava) Operating, expanding 40 MW
Vantage JNB2 Isando Vantage Data Centers Under construction 20 MW
Huawei Cloud JohannesburgKempton Park Huawei Cloud Operating Not reported
Teraco Johannesburg Sandton (Isando / Chislehurston)Sandton Teraco (Digital Realty) Operating Not reported

Open the Gauteng page

Cape Town1
ProjectCompanyStatusPower
Teraco Cape Town (CT1/CT2 Brackenfell)BrackenfellExact site not confirmed Teraco (Digital Realty) Operating Not reported

Open the Cape Town page

KwaZulu-Natal1
ProjectCompanyStatusPower
Teraco Durban DB1Durban Teraco (Digital Realty) Operating 2.2 MW Source off site ↗

Open the KwaZulu-Natal page

Western Cape1
ProjectCompanyStatusPower
AWS Cape Town RegionCape Town Amazon Web Services Operating Not reported

Open the Western Cape page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.