Data centers in Bartow County, Georgia: 4 projects mapped

4 projects tracked
·
3 proposed or being built
·
1 stopped or paused
·
1,500 MW from the 2 active projects that report a figure
Project Bunkhouse (Under construction, 1,300 MW)Project Springbank (Withdrawn, 432 MW)Project Indo (Approved, 200 MW)Switch Data Center (Under construction)
Imagery: Esri, Maxar
Tracked projectStopped or pausedBigger dot, more power4 sites shown

Two large data center campuses are under construction in Bartow County and a third is approved. Project Bunkhouse, on the 876-acre Gaines farm on Taff Road near Stilesboro, was rezoned in June 2025 for Taurus DC SPE LLC and will be run by Digital Realty; the county says it is planned for about 1,300 megawatts of power and $18 billion. Switch is building a campus on about 126 acres outside Cartersville, and on September 3, 2026 the Cartersville City Council approved DataBank's Project Indo, a 200-megawatt campus with two 664,000-square-foot buildings at 218 Industrial Park Road.

Bartow is run by a single commissioner, Steve Taylor, and he has welcomed data centers. "I think five or six would maybe be our limit, as far as our appetite for them," he said in July 2026, adding that two or three more are in the pipeline. The county says it has given the data centers no tax abatements, and Taylor intends to use the new revenue to raise homestead exemptions for homeowners.

Read more

Not every plan went through. After the county planning commission voted 6-1 in April 2025 to recommend denial, Atlas Development withdrew Project Springbank, six buildings totaling about 2.27 million square feet on 630 acres on Barnsley Gardens Road near Adairsville. More than 2,000 people had signed a petition against it, and Barnsley Resort's president, David Friederich, called it "an existential threat" to the resort.

On July 1, 2026, Taylor adopted stricter rules for new data centers: closed-loop cooling only, noise capped at 65 decibels by day and 55 at night at the nearest homes, a 200-foot buffer from residential districts, a 50-acre minimum site, and on-site power plants capped at 300 megawatts.

Data center projects on record in Bartow County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Cartersville3
ProjectCompanyStatusPower
Project BunkhouseCartersville Taurus DC SPE LLC (Digital Realty) Under construction 1,300 MW
Project IndoCartersville DataBank Approved 200 MW
Switch Data CenterCartersville Switch Under construction Not reported
Adairsville1
ProjectCompanyStatusPower
Project SpringbankAdairsville Atlas Development Withdrawn 432 MW

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Zoning limits on data centers

Rules short of a pause: setbacks, noise caps, permit requirements and district limits.

PlaceTypeStartedEnds
Bartow County Zoning limits Jan 1, 2025 No end date Record off site ↗

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.