Data centers in Fairfield County, Ohio: 2 projects mapped

2 projects tracked
·
1 proposed or being built
·
1 operating
·
833 MW across all 2 active projects
OH2 Data Center (Under construction, 696 MW)Google Lancaster (Operating, 137 MW)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power2 sites shown

Vantage Data Centers is building a $2.1 billion campus, OH2, on about 500 acres of former farmland near State Routes 204 and 37 in Millersport, near Buckeye Lake. The company says it will have 696 megawatts of computing capacity in four data center buildings, with construction running from summer 2026 into early 2030. It will run on its own gas power plant, which still needs a state permit: the Ohio Power Siting Board must rule by November 26, 2026. Google also runs a data center on Whiley Road near Lancaster.

The power plant is the fight. Advanced Power, a Boston developer, plans 40 gas turbines, 132 diesel generators and a battery system, all serving Vantage. At a packed siting board hearing at the Millersport school, resident Lorrie Hoover said, "There is no local necessity to have a private, 1,350-megawatt fossil fuel generating station." Others said local officials ignored resistance since the project was announced in May 2025. Union members, most from the Columbus area, spoke in favor.

The state gave Vantage a 50% sales tax break through 2035, worth at least $83 million. Vantage says the campus will employ more than 50 people and use about 15,000 gallons of water a day with closed-loop cooling. Near Lancaster, Tom Bigham, who lives about 200 yards from Google's site, said in 2023 that "it could have been much worse."

Data center projects on record in Fairfield County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Lancaster1
ProjectCompanyStatusPower
Google LancasterLancaster Google Operating 137 MW
Millersport1
ProjectCompanyStatusPower
OH2 Data CenterMillersport Vantage Data Centers Under construction 696 MW