Global Data Centers.formerly Florida Data Centers

Home/Data centers/Canada

Data centers by place

Data centers in Canada: 30 projects mapped

30 projects tracked
·
3 proposed or being built
·
21 operating
·
2 stopped or paused
·
4 with no stage on record
·
1,430 MW from the 9 active projects that report a figure
·
2 moratoriums and bans in effect
Meta Sturgeon County (Proposed, 1,000 MW)Aligned Quebec City (QScale) (Under construction, 142 MW)Synapse Real Estate Corp · Olds (Blocked, 1,000 MW)Almaguin Data Inc. · Armour Township (Withdrawn, 2 MW)STACK Toronto (TOR01) (Operating, 56 MW)Vantage Montreal II (Not reported, 50 MW)Vantage Quebec City (Operating, 86 MW)IREN Prince George (BC) (Operating, 50 MW)Vantage Montreal I (Operating, 11 MW)Vantage Montreal III (Operating, 30 MW)Digital Realty 371 Gough (Markham) (Operating, 5.4 MW)Google Montreal (Operating)Oracle Montreal (Operating)Oracle Toronto (Operating)Microsoft YTO14 (Markham) (Under construction)CoreWeave Cambridge Ontario (Operating)Compass Montreal (Baie-d'Urfé) (Operating)AWS Varennes (Montreal) (Operating)Compass Toronto Etobicoke (Operating)Compass Toronto YYZ2 (Not reported)Compass Montreal II (Operating)Digital Realty 151 Front (Toronto) (Operating)Digital Realty Montreal (Verdun) (Not reported)Digital Realty TOR1 (Vaughan) (Operating)Equinix Toronto Downtown Hub (TR1/TR2/TR4/TR5) (Operating)Equinix Montreal Center (MT1) (Operating)Equinix Calgary Hub (CL1) (Operating)Crusoe Alberta (gas-powered) (Not reported)IREN Canal Flats (BC) (Operating)IREN Mackenzie (BC) (Operating)
Boundaries: Natural Earth
Tracked projectStopped or pausedBigger dot, more power30 sites shown

Meta is planning a $13 billion data center complex in Sturgeon County, north of Edmonton, announced in July 2026. Hundreds of people protested outside the county office in August. Alberta's grid operator says it can connect only 1.2 gigawatts of new data center load by 2028, and it gave that to two of the 36 projects that had applied, pausing the rest.

In August the Alberta Utilities Commission rejected the gas plant behind Synapse Real Estate Corp.'s data center campus in Olds, Alberta, which would have generated 1.4 gigawatts. "The project is too close to the surrounding community," the commission said, noting the site was about 30 meters from the first row of homes. Rocky View County, near Calgary, stopped bringing data center rezonings to council on July 21 while it writes new rules. Oakville, Ontario, adopted a one-year moratorium in August.

Other provinces are rationing power. British Columbia is making 400 megawatts available over two years from February 2026, with no project getting more than 145. Hydro-Québec has asked to charge large data centers 13 cents a kilowatt-hour, about double what other large power customers pay.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Ontario11
ProjectCompanyStatusPower
STACK Toronto (TOR01)Scarborough STACK Infrastructure Operating 56 MW
Digital Realty 371 Gough (Markham)Exact site not confirmed Digital Realty Operating 5.4 MW Source off site ↗
Almaguin Data Inc. · Armour TownshipArmour TownshipExact site not confirmed Almaguin Data Inc. Withdrawn 2 MW Source off site ↗
Compass Toronto EtobicokeEtobicoke Compass Datacenters Operating Not reported
Compass Toronto YYZ2Toronto Compass Datacenters Not reported Not reported Source off site ↗
CoreWeave Cambridge OntarioCambridge CoreWeave Operating Not reported
Digital Realty 151 Front (Toronto)Toronto Digital Realty Operating Not reported Source off site ↗
Digital Realty TOR1 (Vaughan)Vaughan Digital Realty Operating Not reported
Equinix Toronto Downtown Hub (TR1/TR2/TR4/TR5) Equinix Operating Not reported Source off site ↗
Microsoft YTO14 (Markham)Markham Microsoft Under construction Not reported
Oracle TorontoToronto Oracle Operating Not reported

Open the Ontario page

Quebec11
ProjectCompanyStatusPower
Aligned Quebec City (QScale) QScale (Goldman Sachs Alternatives) Under construction 142 MW
Vantage Quebec City Vantage Data Centers Operating 86 MW
Vantage Montreal II Vantage Data Centers Not reported 50 MW Source off site ↗
Vantage Montreal III Vantage Data Centers Operating 30 MW
Vantage Montreal I Vantage Data Centers Operating 11 MW
AWS Varennes (Montreal) Amazon Web Services Operating Not reported
Compass Montreal (Baie-d'Urfé)Baie-d'Urfé Compass Datacenters Operating Not reported
Compass Montreal IIMontreal Compass Datacenters Operating Not reported
Digital Realty Montreal (Verdun) Digital Realty Not reported Not reported Source off site ↗
Google MontrealMontreal Google Operating Not reported
Oracle MontrealMontreal Oracle Operating Not reported

Open the Quebec page

Alberta3
ProjectCompanyStatusPower
Meta Sturgeon CountySturgeon County Meta Proposed 1,000 MW
Synapse Real Estate Corp · OldsOlds Synapse Real Estate Corp Blocked 1,000 MW
Crusoe Alberta (gas-powered)Grande Prairie County Crusoe Not reported Not reported Source off site ↗

Open the Alberta page

British Columbia3
ProjectCompanyStatusPower
IREN Prince George (BC) IREN Operating 50 MW
IREN Canal Flats (BC) IREN Operating Not reported
IREN Mackenzie (BC) IREN Operating Not reported

Open the British Columbia page

AB1
ProjectCompanyStatusPower
Equinix Calgary Hub (CL1)Calgary Equinix Operating Not reported Source off site ↗

Open the AB page

QC1
ProjectCompanyStatusPower
Equinix Montreal Center (MT1)MontrealExact site not confirmed Equinix Operating Not reported Source off site ↗

Open the QC page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Where people here have won

Projects stopped by a vote, pulled by their developer, or blocked in court.

PlaceWhat happenedDateSize
OldsSynapse Real Estate Corp Withdrawn by the developer Alberta Utilities Commission rejected the gas power plant the campus depended on, calling the site unsuitable. Aug 17, 2026 1.4 GW
Armour TownshipAlmaguin Data Inc. Withdrawn by the developer Developer dropped the project after a petition of 1,000+ residents and required impact studies. Jun 1, 2026 2 MW (up to 10 MW), 6.8 acres Story off site ↗
Rocky View County (near Balzac)Kineticor Denied by a vote County council voted 6-1 against the plan the campus needed, citing its impact on local farmers. Sep 9, 2025 1,107 acres Story off site ↗

Moratoriums and bans in effect

Places that have paused or banned new data centers.

PlaceTypeStartedEnds
OakvilleTown or city Moratorium Aug 11, 2026 Aug 11, 2027 Record off site ↗
Rocky View County Moratorium Jul 21, 2026 No end date Record off site ↗

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.