Data centers in Finland: 12 projects mapped

12 projects tracked
·
8 proposed or being built
·
3 operating
·
1 with no stage on record
·
1,636 MW from the 8 active projects that report a figure
DayOne Klaukkala Campus (Nurmijärvi, Finland) (Proposed, 560 MW)Google Hamina (Operating, 200 MW)Pure DC Seinajoki (Kivenneva) (Under construction, 110 MW)Prime Järvenpää (Finland) (Proposed, 130 MW)atNorth FIN04 (Myllykoski, Kouvola) (Under construction, 430 MW)Nebius Finland AI factory (Operating, expanding, 75 MW)QTS Forssa (Proposed, 81 MW)TikTok Finland (Project Clover) (Under construction, 50 MW)Google Kajaani (Proposed)Google Muhos (Proposed)Equinix xScale Helsinki (HE7x) (Not reported)atNorth FIN01/FIN03 (Espoo, Helsinki metro) (Operating)
Boundaries: Natural Earth
Tracked projectBigger dot, more power12 sites shown

Data center projects are spreading across Finnish towns. Earthworks are under way in Forssa for what Yle calls Finland's largest data center, which could use about 8 percent of the country's electricity if fully built. In Lahti, the utility Lahti Energia says a data center under construction for TikTok will double the city's power use, and a second data center is planned there. Google runs a large campus in Hamina and has plans in Kajaani and Muhos.

Local leaders mostly welcome the projects. In Janakkala, where a data center beside Highway 3 is in the permitting stage and about 50 residents came to a recent briefing, municipal manager Riikka Moilanen said property tax alone could reach half a million euros a year, and that power supply and prices are not the municipality's business. Fingrid, the national grid operator, estimates that data centers and electric boilers could raise Finland's electricity use by nearly 40 percent in five years if all are built.

Some residents feel left out. In Jokela, in Tuusula, many people learned of a data center only after it had been approved, and a citizens' initiative asks the municipality to explain the project and open its confidential documents; the municipality is preparing its answer. In Lapinlahti, land zoned for a solar farm became a data center project without a public hearing. Pekka Väisänen of the Järvi-Suomen puolesta association is building a network to track how towns decide on these projects and to warn the next ones.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Uusimaa5
ProjectCompanyStatusPower
DayOne Klaukkala Campus (Nurmijärvi, Finland) DayOne Proposed 560 MW
Prime Järvenpää (Finland)Jarvenpaa Prime Data Centers Proposed 130 MW
Nebius Finland AI factory Nebius Operating, expanding 75 MW
atNorth FIN01/FIN03 (Espoo, Helsinki metro) atNorth (CPP Investments / Equinix) Operating Not reported
Equinix xScale Helsinki (HE7x) Equinix Not reported Not reported Source off site ↗

Open the Uusimaa page

Kymenlaakso3
ProjectCompanyStatusPower
atNorth FIN04 (Myllykoski, Kouvola)Kouvola atNorth (CPP Investments / Equinix) Under construction 430 MW
Google Hamina Google Operating 200 MW
TikTok Finland (Project Clover)KouvolaExact site not confirmed DayOne / Hyperco Under construction 50 MW

Open the Kymenlaakso page

Kainuu1
ProjectCompanyStatusPower
Google KajaaniKajaani Google Proposed Not reported

Open the Kainuu page

Kanta-Häme1
ProjectCompanyStatusPower
QTS ForssaExact site not confirmed QTS Proposed 81 MW

Open the Kanta-Häme page

North Ostrobothnia1
ProjectCompanyStatusPower
Google MuhosExact site not confirmed Google Proposed Not reported

Open the North Ostrobothnia page

South Ostrobothnia1
ProjectCompanyStatusPower
Pure DC Seinajoki (Kivenneva)Exact site not confirmed Pure DC Under construction 110 MW

Open the South Ostrobothnia page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.