AirTrunk plans two new data center campuses, JHB3 and JHB4, in Iskandar Puteri, Johor, Malaysia. The company says their combined IT load would exceed 280 MW and announced an investment of about 12 billion Malaysian ringgit for the two sites.
AirTrunk says the designs would support cloud and AI workloads and use recycled water for cooling.
The facts on file
- Company
- AirTrunk (Blackstone)
- Address
- Taman Perindustrian Nusa Cemerlang, 79200 Iskandar Puteri, Johor, Malaysia
- Region
- Johor
- Country
- Malaysia
- Status
- Proposed
- Power
- 280 MW
- On that figure
- combined IT load of JHB3 and JHB4 as stated by AirTrunk ("more than 280 megawatts")
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.