Data centers in Malaysia: 24 projects mapped

24 projects tracked
·
11 proposed or being built
·
11 operating
·
1 stopped or paused
·
1 with no stage on record
·
2,911 MW from the 13 active projects that report a figure
YTL Green Data Center Park (Operating, 600 MW)DayOne Nusajaya (Operating, 240 MW)Vantage Johor (Sedenak Campus, formerly Yondr) (Operating, 300 MW)Princeton Digital JH1 (Sedenak) (Operating, 200 MW)Google Elmina Business Park (Under construction, 100 MW)Vantage Cyberjaya (KUL2) (Under construction, 436 MW)STACK Johor (JHB01) (Under construction, 220 MW)NTT Gelang Patah (Johor) (Proposed, 290 MW)AirTrunk JHB3/JHB4 (Iskandar Puteri) (Proposed, 280 MW)ByteDance / TikTok Johor (Bridge MY06, Sedenak Tech Park) (Operating, 110 MW)Kota Damansara data center (Withdrawn)NEXTDC KL1 Kuala Lumpur (Under construction, 65 MW)China Mobile Port Dickson (Malaysia) (Proposed, 50 MW)NTT Cyberjaya Campus (CBJ1-CBJ6) (Operating, 20 MW)Google Port Dickson (Under construction)Microsoft Kulai (Johor) (Proposed)AWS Cyberjaya (Under construction)AirTrunk JHB1 (Johor Bahru) (Operating)Huawei Cloud Kuala Lumpur (Operating)YTL Sedenak Tech Park Campus (STeP West, JLand) (Proposed)DayOne Kempas Tech Park Campus (Johor) (Operating)DayOne Greater Kuala Lumpur (Cyberjaya) (Not reported)Keppel DC Johor 1 (Sedenak Tech Park) (Operating)Keppel Basis Bay (Cyberjaya) (Operating)
Boundaries: Natural Earth
Tracked projectStopped or pausedBigger dot, more power24 sites shown

Johor is where Malaysia's data center boom is concentrated, with 15 of the country's 26 tracked projects. YTL Power runs 600 megawatts of operating capacity at its Kulai park, and STACK Infrastructure is building a 220-megawatt campus in two buildings at Iskandar Puteri, due to start delivering space in late 2026. AirTrunk opened its first Johor Bahru site in 2024 and plans two more facilities, JHB3 and JHB4, adding more than 280 megawatts. On February 24, 2026, Prime Minister Anwar Ibrahim said Malaysia had stopped accepting new applications for data centers that are not built for artificial intelligence, citing pressure on power and water.

Water use is the flashpoint. AirTrunk says its planned JHB3 and JHB4 will run on recycled water. In August 2026, YTL and JLand announced a separate gigawatt-scale campus at Sedenak Tech Park West, next to YTL's existing Kulai park. Thirteen of the tracked Malaysian projects, including several large Johor sites, do not have a public construction status yet.

Selangor has the country's other big cluster: Vantage Data Centers is building a 436-megawatt campus at Cyberjaya, and Google is building a 100-megawatt site at Elmina Business Park. In July 2026, a proposed data center in Petaling Jaya's Kota Damansara was withdrawn by its developer after residents objected.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Johor13
ProjectCompanyStatusPower
YTL Green Data Center Park YTL Operating 600 MW
Vantage Johor (Sedenak Campus, formerly Yondr) Vantage Data Centers Operating 300 MW
NTT Gelang Patah (Johor)Exact site not confirmed NTT Global Data Centers Proposed 290 MW
AirTrunk JHB3/JHB4 (Iskandar Puteri) AirTrunk (Blackstone) Proposed 280 MW
DayOne Nusajaya DayOne Operating 240 MW
STACK Johor (JHB01)Iskandar Puteri STACK Infrastructure Under construction 220 MW
Princeton Digital JH1 (Sedenak) Princeton Digital Group Operating 200 MW
ByteDance / TikTok Johor (Bridge MY06, Sedenak Tech Park)Kulai Bridge Data Centres Operating 110 MW
AirTrunk JHB1 (Johor Bahru)Johor Bahru AirTrunk (Blackstone) Operating Not reported
DayOne Kempas Tech Park Campus (Johor) DayOne Operating Not reported
Keppel DC Johor 1 (Sedenak Tech Park)Kulai Keppel Data Centres and Alpha Data Centre Fund Operating Not reported
Microsoft Kulai (Johor)Kulai Microsoft Proposed Not reported
YTL Sedenak Tech Park Campus (STeP West, JLand)Kulai YTL Power (SIPP Power) / JLand Group Proposed Not reported

Open the Johor page

Selangor8
ProjectCompanyStatusPower
Vantage Cyberjaya (KUL2) Vantage Data Centers Under construction 436 MW
Google Elmina Business Park Google Under construction 100 MW
NEXTDC KL1 Kuala Lumpur NEXTDC Under construction 65 MW
NTT Cyberjaya Campus (CBJ1-CBJ6) NTT Global Data Centers Operating 20 MW
AWS CyberjayaCyberjaya Amazon Web Services Under construction Not reported
DayOne Greater Kuala Lumpur (Cyberjaya)Exact site not confirmed DayOne Not reported Not reported Source off site ↗
Keppel Basis Bay (Cyberjaya)Cyberjaya Keppel (Keppel DC REIT) Operating Not reported
Kota Damansara data centerPetaling Jaya Not reported Withdrawn Not reported

Open the Selangor page

Negeri Sembilan2
ProjectCompanyStatusPower
China Mobile Port Dickson (Malaysia)Exact site not confirmed China Mobile International Proposed 50 MW
Google Port DicksonPort Dickson Google Under construction Not reported

Open the Negeri Sembilan page

Federal Territory of Kuala Lumpur1
ProjectCompanyStatusPower
Huawei Cloud Kuala Lumpur Huawei Cloud Operating Not reported

Open the Federal Territory of Kuala Lumpur page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Where people here have won

Projects stopped by a vote, pulled by their developer, or blocked in court.

PlaceWhat happenedDateSize
Kota Damansara Withdrawn by the developer Proposal withdrawn after residents objected. Jul 28, 2026 Not reported

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.