Bridge Data Centres project

ByteDance / TikTok Johor (Bridge MY06, Sedenak Tech Park) data center, Kulai, Johor

Sedenak Tech Park, Kulai, Johor, Malaysia

Bridge Data Centres·Operating·110 MW

The siteImagery: Esri, Maxar

Bridge Data Centres and ByteDance opened the first phase of the MY06 data center in Sedenak, Johor, Malaysia, in October 2022. The phase was the first of three planned buildings in a 110 MW project on 38 acres, so 110 MW refers to the full project rather than the opened phase.

ByteDance System was named the anchor tenant, according to the Malaysian Investment Development Authority.

The facts on file

Company
Bridge Data Centres
Tenant
ByteDance / TikTok
Address
Sedenak Tech Park, Kulai, Johor, Malaysia
Region
Johor
Country
Malaysia
Status
Operating
Power
110 MW
On that figure
project total, "the 110MW hyperscale data centre project"; phase 1 is the first of three buildings
Operating or planned
2022
Record checked
Sep 29, 2026

Sources

Everything above comes from these. Open one and check it yourself.

Other projects nearby

Sites we track within 40 km.

Share this

XFacebookText message

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.