Data centers in Italy: 16 projects mapped

16 projects tracked
·
5 proposed or being built
·
6 operating
·
1 stopped or paused
·
4 with no stage on record
·
831 MW from the 9 active projects that report a figure
CloudHQ Milan (MXP Magenta) (Proposed, 240 MW)Digital Realty Milan (Abbiategrasso) (Proposed, 120 MW)NTT Milan (Proposed, 128 MW)Data4 Milan MIL02 (Vittuone) (Not reported, 100 MW)East Gate / Edge Gate · Travagliato (Withdrawn, 120 MW)CyrusOne Milan MIL2 (Not reported, 54 MW)STACK Milan (Siziano) (Operating, 50 MW)Vantage Milan I (Melegnano) (Not reported, 64 MW)CyrusOne Milan (MIL1) (Under construction, 27 MW)Compass Milan (Proposed, 48 MW)Google Milan (Operating)Microsoft Settala (Milan) (Operating)Digital Realty Rome (ROM1) (Operating)Equinix xScale Milan (ML5x) (Not reported)Equinix Genoa Subsea Landing (GN1) (Operating)Keppel Milan Data Centre (Operating)
Boundaries: Natural Earth
Tracked projectStopped or pausedBigger dot, more power16 sites shown

Most of Italy's data centers, built and planned, are around Milan in Lombardy. The fight there started this summer in Lacchiarella, a town of about 9,000 between Milan and Pavia, where residents held Lombardy's first street protest against data centers on July 12, 2026. They oppose a planned campus of 230,000 square meters and more than 3.5 billion euros that its opponents say would be the biggest in Italy.

Enrico Duranti, a founder of the local Ciarlasco committee, said the campus would use as much energy as 500,000 families and called it colonization. Residents say they, not their town halls, worked out what the projects meant. In late July more than 150 people met in Rho to call for an immediate moratorium on new data centers across Lombardy, and organizers are planning a regional march.

In Travagliato, near Brescia, the town came out against a 120-megawatt data center this summer after 450 residents signed a letter against it; Mayor Renato Pasinetti said the developer, a new company with 10,000 euros of capital, had given only vague answers. The developer, East Gate, has since withdrawn its application. Lombardy's new regional law, in force since June 20, 2026, steers data centers toward old industrial land and charges more to build on farmland.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Lombardy14
ProjectCompanyStatusPower
CloudHQ Milan (MXP Magenta)Milan CloudHQ Proposed 240 MW
NTT MilanExact site not confirmed NTT Global Data Centers Proposed 128 MW
Digital Realty Milan (Abbiategrasso) Digital Realty Proposed 120 MW
East Gate / Edge Gate · TravagliatoTravagliatoExact site not confirmed East Gate / Edge Gate Withdrawn 120 MW
Data4 Milan MIL02 (Vittuone)Milan Data4 (Brookfield) Not reported 100 MW Source off site ↗
Vantage Milan I (Melegnano)Milan Vantage Data Centers Not reported 64 MW Source off site ↗
CyrusOne Milan MIL2Milan CyrusOne Not reported 54 MW Source off site ↗
STACK Milan (Siziano)Siziano STACK Infrastructure Operating 50 MW
Compass MilanExact site not confirmed Compass Datacenters Proposed 48 MW
CyrusOne Milan (MIL1)Segrate CyrusOne Under construction 27 MW
Equinix xScale Milan (ML5x) Equinix Not reported Not reported Source off site ↗
Google MilanMilan Google Operating Not reported
Keppel Milan Data Centre Keppel (Keppel DC REIT) Operating Not reported
Microsoft Settala (Milan)Settala Microsoft Operating Not reported

Open the Lombardy page

Liguria1
ProjectCompanyStatusPower
Equinix Genoa Subsea Landing (GN1) Equinix Operating Not reported

Open the Liguria page

Rome1
ProjectCompanyStatusPower
Digital Realty Rome (ROM1)Exact site not confirmed Digital Realty Operating Not reported

Open the Rome page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Where people here have won

Projects stopped by a vote, pulled by their developer, or blocked in court.

PlaceWhat happenedDateSize
TravagliatoEast Gate / Edge Gate Withdrawn by the developer Developer withdrew its plans. Sep 2026 120 MW

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.