Data centers by place

Data centers in Marion County, Indiana: 8 projects mapped

8 projects tracked
·
3 proposed or being built
·
2 operating
·
2 stopped or paused
·
1 with no stage on record
·
376 MW from the 4 active projects that report a figure
·
1 moratorium or ban in effect
Google Franklin Township (Withdrawn)Sabey Decatur Township (Indianapolis) (Approved, 250 MW)American Tower Edge Data Center (Indianapolis) (Suspended, 4 MW)Brightwood Data Center (Approved, 72 MW)Thunderbird Commerce Center Project (Approved, 52 MW)US Signal Data Center (Operating, 2 MW)Equinix Indianapolis Hub (IP1) (Not reported)Lifeline Data Center (Operating)
Imagery: Esri, Maxar
Tracked projectStopped or pausedBigger dot, more power8 sites shown

Marion County has stopped permitting new data centers until December 31, 2027. The Indianapolis City-County Council voted 23-1 on August 10, 2026 to approve the pause, and the Metropolitan Development Commission gave it final approval, 6-0, on August 19. Until then the county's zoning code did not define a data center; the council added one from the floor covering any facility built primarily to store, manage, process or transmit digital data, including AI training and cloud computing.

The pause is meant to produce permanent rules, not just delay. City staff are to convene a committee on campus size, building height, noise levels and environmental impact before the moratorium ends. It does not cover projects already approved: Sabey's 250-megawatt campus in Decatur Township, DC Blox's Thunderbird Commerce Center in Warren Township and Metrobloks' Brightwood project in Martindale-Brightwood are all exempt, so the residents who fought hardest against those three got a pause that does not touch them.

The county also has two smaller data centers already running, Lifeline Data Center and US Signal Data Center, both in Indianapolis. American Tower has suspended its 4-megawatt Edge Data Center project, and Google withdrew its Franklin Township proposal. Equinix lists a data hub in Indianapolis on its own materials, but the company's own current world map of its markets does not include Indianapolis, so its size and status here are unclear.

Data center projects on record in Marion County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Indianapolis8
ProjectCompanyStatusPower
Sabey Decatur Township (Indianapolis)Indianapolis Sabey Data Centers Approved 250 MW
Brightwood Data CenterIndianapolis Metrobloks Approved 72 MW
Thunderbird Commerce Center ProjectIndianapolis DC Blox Approved 52 MW
American Tower Edge Data Center (Indianapolis)Indianapolis American Tower Suspended 4 MW Source off site ↗
US Signal Data CenterIndianapolis US Signal Operating 2 MW Source off site ↗
Equinix Indianapolis Hub (IP1)Indianapolis Equinix Not reported Not reported Source off site ↗
Google Franklin TownshipIndianapolis Google Withdrawn Not reported
Lifeline Data CenterIndianapolis Lifeline Data Centers Operating Not reported

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Moratoriums and bans in effect

Pauses on new data centers covering this area.

PlaceTypeStartedEnds
IndianapolisTown or city Moratorium Aug 19, 2026 Dec 31, 2027 Record off site ↗

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.